In Pics: J&K’s Anji-Khada Bridge Nears Completion; 1st Cable-Stayed Railway Bridge In India

Credits: X (Formerly, Twitter)

It is the 1st cable-stayed railway bridge in India and connects Katra in J&K to Reasi.

Anji-Khada Bridge

Credits: X (Formerly, Twitter)

The bridge is asymmetrical and is finally nearing completion.

Asymmetrical Bridge

Credits: X (Formerly, Twitter)

The structure of the bridge is now fully completed and it will soon begin the work of laying tracks.

Track-laying To Begin

Credits: X (Formerly, Twitter)

The tallest pylon on the bridge is 193 metres tall and is perched at a height of 331 metres.

Height Of The Bridge

Credits: X (Formerly, Twitter)

The total length of the bridge is 725 metres and the main bridge is 473.25 metres long.

Length Of The Bridge

Credits: X (Formerly, Twitter)

The bridge is supported by a total of 96 cables.

Number Of Cables

Credits: X (Formerly, Twitter)

It is said that the bridge will be fully completed by the end of the year.

Date Of Completion

Credits: X (Formerly, Twitter)

It is a part of the Udhampur-Srinagar-Baramulla Rail Link & will connect the rest of the country to the Union Territory by rail.

Part Of USBRL

Credits: X (Formerly, Twitter)

It is an architectural marvel of India and a commendable feat!

Credits: X (Formerly, Twitter)