Credits: X (Formerly, Twitter)
It is the 1st cable-stayed railway bridge in India and connects Katra in J&K to Reasi.
Credits: X (Formerly, Twitter)
The bridge is asymmetrical and is finally nearing completion.
Credits: X (Formerly, Twitter)
The structure of the bridge is now fully completed and it will soon begin the work of laying tracks.
Credits: X (Formerly, Twitter)
The tallest pylon on the bridge is 193 metres tall and is perched at a height of 331 metres.
Credits: X (Formerly, Twitter)
The total length of the bridge is 725 metres and the main bridge is 473.25 metres long.
Credits: X (Formerly, Twitter)
The bridge is supported by a total of 96 cables.
Credits: X (Formerly, Twitter)
It is said that the bridge will be fully completed by the end of the year.
Credits: X (Formerly, Twitter)
It is a part of the Udhampur-Srinagar-Baramulla Rail Link & will connect the rest of the country to the Union Territory by rail.
Credits: X (Formerly, Twitter)
It is an architectural marvel of India and a commendable feat!
Credits: X (Formerly, Twitter)