Surat-Chennai Expressway: From Length To Travel Time, All About Project Built At About ₹50,000 Cr

Image Courtesy: X/ पूर्व संकाय प्रमुख,सामाजिक विज्ञान संकाय, BHU (@fssdean)

Construction of the Surat-Chennai Expressway is going on in full swing. To know important updates and information about the project, read on.

Crucial Expressway

Image Courtesy: X/ Apuroop Achanta (@digitaldetox_9)

It is a remarkable expressway of 1,271 km with a speed limit of 120 km/h.

1. Its Length:

Image Courtesy: Canva

Image for representation 

The estimated budget of the Surat-Chennai Expressway is about ₹45,000 to ₹50,000 crores.

2. Total Cost:

Image Courtesy: X/ Apuroop Achanta (@digitaldetox_9)

Soon to become India's second-longest expressway, the overall duration will decrease by half. Right now, it takes about 35 hours to complete the journey. However, it will take only about 18 hours on this road. 

3. Travel Time:

Image Courtesy: X/ पूर्व संकाय प्रमुख,सामाजिक विज्ञान संकाय, BHU (@fssdean)

Connecting Surat and Chennai, it will cover Gujarat, Maharashtra, Karnataka, Telangana, Andhra Pradesh, and lastly Tamil Nadu.

4. Covering Places:

Image Courtesy: Canva

Image for representation 

From constructing to operating it, the National Highways Authority of India has all the responsibilities. 

5. Who Is Working?

Image Courtesy: X/ Apuroop Achanta (@digitaldetox_9)

According to a report by News 18, the project will take by the end of 2025 for completion.

6. Expected Completion:

Image Courtesy: Canva

Image for representation 

Once the national expressway opens to the public, it will create a significant link between Indian states in the West and places in the South.

Image Courtesy: X/ पूर्व संकाय प्रमुख,सामाजिक विज्ञान संकाय, BHU (@fssdean)