Umiam Bridge In Meghalaya To Be Closed For Maintenance From March 31; Details Here

Credits: X (Formerly, Twitter)

Meghalaya’s state government has announced the closure of Umiam Bridge, which is a major connector.

Umiam Bridge

Credits: X (Formerly, Twitter)

The closure will begin on March 31 and will have a soft opening on April 8.

From March 31

Credits: X (Formerly, Twitter)

The closure is being undertaken for necessary maintenance purposes.

Maintenance Purposes

Credits: X (Formerly, Twitter)

MLA Adelbert Nongrum urged the government to reconsider this as 31st March is Easter & many would be travelling.

Urged To Reconsider

Credits: X (Formerly, Twitter)

Between 8 AM to 2 PM from March 31 to April 7, there will be a complete halt of traffic.

Timings Of Closure

Credits: X (Formerly, Twitter)

After 2 PM till 7 AM on said dates, vehicles weighing 4 tonnes with 2.5-metre height will be allowed to ply.

Half Lane Open

Credits: X (Formerly, Twitter)

From 7 AM onwards on April 8, vehicles up to 15 tonnes will be allowed.

Soft Opening

Credits: X (Formerly, Twitter)

Routes like Shillong-Mawtawar-Umroi Airport-Lad Umroi Road, Shillong-NEIGRIHMS-Diengpasoh-Lad Umroi Road and UCC-Mawlyndep-Mawmaram Road can be taken.

Alternative Routes

Credits: X (Formerly, Twitter)

How will this closure impact your travels?

Credits: X (Formerly, Twitter)