Home

  /  

India

  /  

Trending

  /  

Delhi Metro Starts Work On New Golden Line For South Delhi; Check List Of 8 Stations

The project, called Golden Line-11, is expected to enhance connectivity across South Delhi. It will be a key link designed to provide seamless integration with existing metro lines.

by Ashmeet Guliani
Delhi Metro Starts Work On New Golden Line For South Delhi; Check List Of 8 Stations

Delhi Metro, the lifeline of the capital, is all set to get a new Golden Line. The Delhi Metro Rail Corporation (DMRC) has begun construction on the Lajpat Nagar-Saket G Block corridor. This new stretch will soon become a vital link in South Delhi and will have eight stations. Here is everything you need to know about this latest development. 

Delhi Metro Begins Work On Golden Line-11


The Delhi Metro Rail Corporation (DMRC) took to its X account on Friday to make an important announcement. The authorities have formally started construction on the much-anticipated Lajpat Nagar-Saket G Block corridor under Phase IV. The project, called Golden Line-11, is expected to enhance connectivity across South Delhi. It will be a key link designed to provide seamless integration with existing metro lines.

According to their X post, the officials carried out the first Test Pile and Ground-Breaking Ceremony at Pushpa Bhawan near Saket. It marked a major milestone in the expansion of Delhi’s metro network. Dr Vikas Kumar, MD, DMRC, and other senior officials were present. Officials from Rail Vikas Nigam Limited (RVNL), the contractor for this section, also attended.

Also Read: Delhi Metro To Start Ultrasonic Rail And Weld Testing To Improve Passenger Safety

The Corridor Will Have 8 Metro Stations 

The upcoming Lajpat Nagar to Saket G Block corridor will be elevated. It will comprise eight metro stations:

  • Lajpat Nagar
  • Andrews Ganj
  • GK-1
  • Chirag Delhi
  • Pushpa Bhawan
  • Saket District Centre
  • Pushp Vihar
  • Saket G Block

As per a report by NDTV, this new line will integrate with three major existing corridors for interchange, which are:

  • Lajpat Nagar: Interchange with Violet Line and Pink Line
  • Chirag Delhi: Interchange with Magenta Line

Each coach on the upcoming corridor will be designed to accommodate about 300 passengers. According to DMRC, key areas of South Delhi, such as Greater Kailash-1, Saket and Pushp Vihar will benefit from this corridor. Many schools and government offices will also get better metro access. The first Test Pile marks the beginning of major civil works, laying the foundation for the new corridor. In conclusion, this corridor will ease travel for lakhs of commuters and strengthen the city’s transport infrastructure.

Also Read: First Phase Of 2 New Mumbai Metro Lines Set To Open By Dec End; All You Need To Know

So, are you excited for this new metro line in Delhi? We surely are!

Cover Image Courtesy: Delhi Metro, Wikipedia/ AshuSinghRajput2020

For more such snackable content, interesting discoveries and the latest updates on food, travel and experiences in your city, download the Curly Tales App. Download HERE.
First Published: December 12, 2025 4:33 PM