When it comes to expanding the metro network, Mumbai isn’t stopping anytime soon. For Mumbaikars is has become a go-to mode of transport and relief from those local train crowd pushing. Now, MMRC is planning to develop Metro Line 11 connecting Wadala and the Gateway of India.
Mumbai Metro To Connect Wadala-Gateway Of India
For the metro network between Wadala and the Gateway of India in Mumbai, the Mumbai Metro Rail Corporation (MMRC) has begun a baseline socio-economic survey of around 800 buildings and structures that the project may affect. This 17.5 km underground Metro Line 11 corridor is expected to make travel easier for commuters.
As per Hindustan Times, in a notice issued on Monday, MMRC has asked people living in or owning these properties to share the required documents for the survey. These include:
- Aadhaar cards
- Electricity and water bills
- Property tax receipts
- Property cards
- Rent receipts and rent agreements
- Ration cards
- Index-II documents
- Occupancy certificates
- Business licences
Socioquest Solutions team will arrive to take measurements, photos and videos of the property. You will show the original documents and submit photocopies to the authorised survey team. For any questions, visit MMRC’s Coordination Committee office near the Suburban Collector’s Office.
Also Read: After 45 Years, Mumbai Man Leaves His Juhu Home For Mumbai Metro Line 2B
Metro Line 11 To Feature 14 Underground Stations
The upcoming Mumbai Metro line will have 14 underground stations. These include Anik Depot, Wadala Depot, CGS Colony, Ganesh Nagar, BPT Hospital, Shivdi, Haji Bunder, Darukhana, Byculla, Nagpada Junction, Bhendi Bazaar, CSMT Metro, Horniman Circle and Gateway of India.
According to Hindustan Times, the Maharashtra government has also planned to extend Metro Line 11 by another 6.9 km. This extension will take the route through Dharavi to Bandra Railway Terminus.
How excited are you to travel on this route? Tell us in the comments below!
Also Read: Why Are Mumbai Metro’s Green Line 4 & Pink Line 6 Still Incomplete After 8 Years?
Cover Image Courtesy: Reddit/TransitIndia (Representative Image)
FAQs
When will Mumbai Metro Line 11 start?
The work on Mumbai Metro Line 11 has not yet started. MMRC will begin survey of affected properties.
What is the full form of MMRC?
The full form of MMRC is Mumbai Metro Rail Corporation.
How long is Mumbai Metro Line 11 corridor?
The Mumbai Metro 11 will be 17.5 km underground corridor.