Infrastructure across India is growing, and each project makes sure to offer as many benefits as possible to the people. Now, Odisha has also joined this infrastructure development list. The National Highways Authority of India has started work on the Bhubaneswar Capital Region Ring Road to improve travel, reduce traffic congestion, and support economic and regional development. Scroll down to know more!
Odisha Ring Road Project To Start Soon
Odisha is planning a new ring road project that will make travel faster and easier for everyone. As per News18, the plan is to build a 111-km, six-lane ring road from Rameshwar to Tangi. Why? This high-speed road will allow vehicles to travel up to 100 km per hour. The amazing part is that this road project is expected to be completed in about 30 months once work begins. The project is being built in three parts to make construction smoother and faster.
Once completed, this ring road will help reduce traffic in Bhubaneswar, Cuttack, and Khordha. It will also improve access to tourist and religious places like Puri and the Jagannath temple, bringing a sigh of relief among Lord Jagannath devotees.
Also Read: Stuck In Mumbai-Pune Expressway Jam On Feb 3? Are You Eligible For A Refund &; How To Get It?
Project Is Divided In Three Parts
In the first part, Patel Infrastructure Limited will build a 40-km stretch from Rameshwar to Bilipada. According to News18, this section will have service roads on both sides, two interchanges, one railway overbridge, and ten minor bridges. It will also include 142 culverts for water drainage, seven elevated underpasses, and other road structures to improve smooth traffic movement.
The second section, from Bilipada to Govindpur, will be constructed by VRC Constructions (India) Limited. This 30-km stretch will have service roads, three interchanges, eleven minor bridges, and 90 culverts. It will also feature three elevated underpasses along with VUP, LVUP, and SVUP road systems. A rest facility for the travellers will also be added.
The third part will be built by HG Infra Engineering Limited and will cover the 40-km stretch from Govindpur to Tangi near Bandola Toll Plaza. This section will include slip roads, one interchange, 23 minor bridges, and 69 culverts. It will also have underpasses and multiple VUP, LVUP, and SVUP structures, plus a rest facility for travellers.
How excited are you for this new road in Odisha? Tell us in the comments below!
Also Read: Which Cities Will The 594-Km Ganga Expressway In UP Connect? Check Toll Fare, Date & More
Cover Image Courtesy: Canva Pro/ Marcio Serrado (Representative Image)

