Bengaluru Airport To Get India’s First Point Merge System, Only Available At Few Global Airports

Bengaluru airport

Cover Image Courtesy: Wikimedia Commons/ Ank Kumar

While travelling by flight, all we wish for is less time at security checks and fewer flight delays or cancellations. Guess what? Travellers flying from Bengaluru’s Kempegowda International Airport are in for a major surprise. The airport is preparing for major upgrades that will make departures and arrivals smoother. Read on to know more!

Bengaluru Airport Set For Major Operational Upgrade

After dual-runway operations were introduced in 2019, the current upgrades are the biggest so far. As per Moneycontrol, the new plans have received approval from the Directorate General of Civil Aviation (DGCA), Airports Authority of India (AAI), and the Ministry of Civil Aviation. These upgrades at Bengaluru’s Kempegowda International Airport aim to improve on-time performance, reduce congestion in the air and on the ground, and help airlines save fuel. 

The biggest benefit for passengers is that flights will be able to take off from both runways at the same time. Right now, a flight on one runway often has to wait until the other runway is free. With the new satellite-based flight paths, both runways can operate independently. 

Also Read: Man Claims His Commute To Bengaluru Airport Took Longer Than Flight To Kolkata; Sparks Debate

First Indian Airport To Test Point Merge System

The airport is also set to introduce 22 new satellite-guided Standard Instrument Departure (SID) routes. Moneycontrol reported that as for the arriving flights, Bengaluru is likely to become the first airport in India to test the Point Merge System (PMS). The system will run on a 91-day trial. 

Under the new system, planes will follow a fixed route while landing instead of getting frequent directions from air traffic controllers. This will make the landing smoother for passengers with fewer changes in direction. It will also help airlines save fuel and reduce carbon emissions. 

The new landing system will first be tested only when the weather is good and air traffic is not too busy. Officials will closely watch how it works before deciding whether to use it permanently. Along with this, the airport will also introduce 12 new arrival routes to help flights land more smoothly and efficiently. 

How excited are you for these upgrades? Tell us in the comments below!

Also Read: Bengaluru Airport City To Get State-Of-Art Exhibition Hub, Luxury Hotels & More By 2031

Cover Image Courtesy: Wikimedia Commons/ Ank Kumar

FAQs

When was major upgrade was introduced at Bengaluru's airport before 2026?

The previous major upgrade at Bengaluru Airport was in 2019, when dual-runway operations were introduced.

Which Indian airport is the first to try Point Merge System?

Bengaluru Airport is the first to try the Point Merge System (PMS).

Why Bengaluru airport introduced major upgrades?

Bengaluru Airport introduced these major upgrades to reduce flight delays, improve on-time performance, ease congestion, and make flight operations more efficient.

Priyanshi Shah: Hot chocolate, books, and rom-com movies are what keep Priyanshi going. When she’s not working, you’ll find her either enjoying hot chocolate or going for a ride.